LEON COUNTY - Florida's Capital County
Leon County Logo Volunteer Day Street Activity Image of Lake Munson Image of the Courthouse
Image of an Azela Bush Image of a kid getting their face painted
home
Agendas
Online Services
Community Resources
Search
Left side line art


 
spacer image
bullet Leon County Home Page
spacer image
bullet County Projects
spacer image spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image
spacer image

 
right side line art

Lake Heritage Dam Improvements

HISTORICAL BACKGROUND

The Lake Heritage Dam was constructed prior to 1977 and is located in the Lake Heritage Estates residential neighborhood on the south side of Apalachee Parkway. The Lake Heritage Dam is an approximately 14-foot-high earthen dam. The existing primary spillway consists of a valve and riser structure in the lake and a corrugated metal pipe through the dam. A secondary spillway consists of swales and culverts between private residences on the east side of the lake. The primary spillway is currently in a “failed” condition. For some time leakage/seepage has been observed around and through the pipe, and this flow has increased over the years. The County’s goal is to address modifications to the dam and spillway systems that will allow the dam to maintain the lake safely at the current levels.

 

 

PROPOSED IMPROVEMENTS

The proposed improvements consist of maintaining the existing lake level at elevation 86.8 NAVD by constructing a new overflow weir at the dam to serve as the primary outfall structure. The existing secondary spillway system would serve as the secondary outfall. Overall, this project will restore function to the Lake Heritage outfall structures and allow storm events to pass through the dam in a safe and controlled manner, while adhering to the Leon County code requirements for flood protection elevations.
 

 

Project Overview:
 


Phase 1: Data Analysis and Conceptual Design –
To be completed in 2 weeks after the final decision is provided by the County.

Phase 2: Design & Permitting Services – 10 months

Construction: 6-9 months

PROJECT EVENTS

  Open House – Project Update
Date: Thursday, March 31, 2011
Time: 6:00 PM – 7:30 PM
Place: Woodrun Baptist Church
           8203 Apalachee Parkway
           Tallahassee, FL 32311
           (850)877-0820
 

To view photos, click here
 

PROJECT CONTACTS:

  George Su, P.E.
Leon County Department of Public Works 
2280 Miccosukee Road, Tallahassee, FL 32308
 
Email: SuShin@leoncountyfl.gov
 
Phone: (850)606-1500      Fax: (850)606-1501